Our proven renovation process that prevents mistakes and delays

After 25+ years and hundreds of renovations, we’ve refined our process to eliminate the common problems that plague renovation projects. Here’s exactly how we manage your renovation from start to finish.

Every successful renovation starts with understanding your needs, lifestyle, and budget.

01

On-Site Visit

We visit your home to assess the current space, take measurements, and identify any potential issues.

02

Needs Assessment

Understanding your lifestyle, accessibility requirements, and design preferences.

03

Budget Discussion

Honest conversation about realistic costs and what’s achievable within your budget.

04

Initial Assessment

Basic layout options and design direction based on your requirements.

Detailed planning prevents costly changes and delays during construction.

01

Detailed Design

Working drawings showing exact layout, fixtures, and finishes.

02

Material Selection

Choosing tiles, fixtures, colors, and finishes within your budget.

03

Permit Applications

Submitting all required permits and approvals before work begins.

04

Final Quote

Detailed, fixed-price quote covering all aspects of the renovation.

Proper preparation sets the foundation for a smooth renovation process.

01

Material Ordering

All materials ordered and delivery scheduled to minimize delays.

02

Trade Coordination

Scheduling all trades and ensuring everyone knows their role and timing.

03

Site Protection

Protecting your home’s other areas from dust and damage.

04

Client briefing

Final walkthrough of the plan and timeline with our project manager.

Safe, efficient removal of existing fixtures and materials.

Why We Do Complete Strip-Outs

Unlike companies that “tile over” existing surfaces, we always do complete strip-outs. This allows us to address any hidden problems and ensure proper waterproofing from the ground up.

01

Service Isolation

Safely disconnecting water, gas, and electrical services.

02

Fixture Removal

Careful removal of bath, toilet, vanity, and other fixtures.

03

Tile and Surface Removal

Complete removal of all tiles and old waterproofing.

04

Waist Disposal

Proper disposal of all materials according to environmental regulations.

Installing the “bones” of your new bathroom.

01

Structural Work

Any required structural modifications or reinforcement.

02

Rough-In Plumbing

Installing new water supply and waste pipes to new locations.

03

Rough-In Electrical

Running new electrical cables for lights, fans, and power points.

04

Insulation and Backing

Installing insulation and proper backing for fixtures and fittings.

Our specialized waterproofing team takes over for this critical phase.

No Shortcuts on Waterproofing

This stage cannot be rushed. Each coat must dry for 24 hours minimum, and we test everything before proceeding. This is where most bathroom failures occur, so we take no chances.

01

Surface Preparation

Ensuring all surfaces are clean, dry, and ready for waterproofing.

02

Primer Application

Specialized primer for optimal membrane adhesion.

03

First Membrane Coat

First coat of blue waterproofing membrane applied.

04

Reinforcement

Fabric reinforcement tape at all joints and corners.

05

Second Membrane Coat

Second coat ensuring complete coverage and protection.

06

Testing and Certification

Flood testing and certification before any other work proceeds.

Professional tiling that will last decades.

01

Layout Planning

Calculating tile layout for best appearance and minimal cuts.

02

Floor Tiling

Installing floor tiles with proper falls to drains.

03

Wall Tiling

Wall tiles installed with precision cuts around fixtures.

04

Grouting

Professional grouting with appropriate grout for each area.

Installing your new bathroom fixtures and fittings.

01

Plumbing Fixtures

Installing toilet, vanity, taps, and shower fixtures.

02

Electrical Fixtures

Installing lights, exhaust fans, and electrical accessories.

03

Cabinet and Storage

Installing vanity, mirrors, and storage solutions.

04

Shower Screens

Installing shower screens and doors.

Our caulking specialists ensure every seal is perfect.

Why Specialized Caulking Matters

This is where we differ from other companies. Our dedicated caulking team ensures every seal is perfect, preventing the water damage that destroys so many renovations.

Ensuring everything meets our high standards before you take possession.

01

Quality Inspection

Our project manager inspects every detail of the renovation.

02

Testing All Systems

Testing plumbing, electrical, and ventilation systems.

03

Final Cleaning

Professional cleaning leaving your bathroom ready to use.

04

Client Walkthrough

Final walkthrough with you, explaining care and maintenance.

05

Warranty Documentation

Providing all warranties, compliance certificates, and care instructions.

Timeline Management

A typical RenoWarriors bathroom renovation takes 3-4 weeks, depending on complexity. We provide a detailed timeline at the start and update you throughout the process.

Week 1

Demolition, rough-in work, waterproofing start

Week 2

Waterproofing completion, tiling start

Week 3

Tiling completion, fixture installation

Week 4

Caulking, final details, inspection, handover

Experience Our Proven Process

25+ years of refinement means your renovation runs smoothly from start to finish.